Wow! Things are moving fast! The holes for the pilings for our multi-purpose sports court are being drilled right now, metal columns are two stories high above the new cafeteria area, and this week the 2nd floor concrete base will be poured. Our wooden structure is almost all demolished and we have a temporary roofed picnic area out by the soccer field. We appreciate everyone’s flexibility as we adjust walls and spaces to accommodate the ongoing construction. The best viewing spot is the 3rd floor lounge area by the elevator, so if you are at school, it is worth the effort to go up and see the progress.